1. Senior Peer Review with Responsible Control
Lump-sum agreement reviews of documents, with responsible control, and stamping authority, where the project falls within my jurisdictions, and disciplinary scope. A senior second set of eyes that produces a sealed deliverable.
Feasibility and spatial conflict resolution before document phase advances. Reduces rework, RFIs, and change orders beforeon site..In- action: $350M+ food processing facility — multi-discipline clash resolution in ACC across architectural shell, process equipment, and MEP for an 80-ft IMP-enclosed bagging tower.
2. Risk Mitigation, Profit Margins Kept
3.Senior-Level Integration, Exactly When You Need It
3. Life-Safety & HazLoc Compliance
IBC means of egress coordination with interior process equipment and exterior shell. Fire separation planning. NFPA, NEC, IBC, and OSHA compliance — including combustible dust strategy, explosive vapor ventilation, and C1D2 spatial separation audits. OSHA-to-IBC transitions on multi-level industrial egress paths.
Example: Two municipal power generation plants — gas train weather enclosures sized for ventilation permeability requirements maintaining C1D2 classification under the NEC.
Focused architectural consulting for A/E teams and facility owners during Design Development and Construction Documents in complex commercial and industrial environments.
5. Roof & Penetration Point Cloud Audits
Precise coordination of sprinklers, cable trays, piping, curbs, vents, and joist obstructions above and below the ceiling plane — using Point Cloud Scan-to-BIM workflows reconciled against existing conditions. Roof drain and overflow drain sizing for new IMP-clad tower additions.
4. Industrial Process & Sanitary Coordination
Equipment clearance verification, maintenance access, and operational safety zones in complex industrial environments. FDA hygienic-zone design with clean / dirty area protocol, heavy washdown environments, compound-sloped concrete pours, slot trench drain and catch basin detailing, vent-to-roof routing, and process sanitary planning.
Example: Cornstarch bagging facility — slab tear-out and compound-sloped re-pour beneath active conveyors, with new trench drains tying into two existing 75-year-old sewer mains located via point cloud reconciled against 1955 record drawings.
How It Works
Direct principal access. No delegation. Reserved capacity engagements — a defined number of hours per week over a fixed period (typically 20 hours, 2–8 weeks), integrated into your ACC, Revit, Navisworks, or Bluebeam workflow from day one. Off the market for the duration of your block.
Serving A/E firms and facility managers across NH, ME, MA, and the I-95 Seacoast corridor.
Traditional architectural services available on request.